number | company name | time | project name | system process | quantity | note | ||
SNCR denitration system | ||||||||
1 |
Qinzhou sea Noel green power generation co., LTD |
2015 |
2 x 300 t/d waste incineration boiler flue gas purification |
SNCR denitration system (urea process) |
two kits | EPC turn-key | ||
2 |
Everbright environmental protection energy (north) co., LTD |
2015 |
2 x 400 t/d waste incineration boiler flue gas purification |
SNCR denitration system (urea process) |
two kits | EPC turn-key | ||
3 |
Everbright environmental protection energy (wujiang) co., LTD |
2015 |
2 x 750 t/d waste incineration boiler flue gas purification |
SNCR denitration system (urea process) |
two kits | EPC turn-key | ||
4 |
Shanghai industrial boiler works macro river paper (sun) |
2016 |
1 x 280 t/h fluidized bed SNCR + SCR denitration system |
SNCR denitration system (urea process) |
one set | EPC turn-key | ||
5 | Tangshan city clean energy co., LTD | 2016 | 1x30t/d waste treatment projects |
SNCR denitration system (urea process) |
one set | supply | ||
6 | Everbright environmental protection energy (tengzhou) co., LTD | 2016 |
2 x 350 t/d waste incineration boiler flue gas purification |
SNCR denitration system (urea process) |
two kits | EPC turn-key | ||
7 | Everbright environmental protection energy (pingdu) co., LTD | 2016 |
2 x 300 t/d waste incineration boiler flue gas purification |
SNCR denitration system (urea process) |
two kits | EPC turn-key | ||
SCR denitration system | ||||||||
1 |
Everbright environmental protection energy (ningbo) co., LTD |
2015 |
1 x 500 t/d waste incineration boiler flue gas purification |
SCR denitration system (low temperature catalyst technology) |
one set | EPC turn-key | ||
SDA rotating spray method Flue gas purification | ||||||||
1 |
Everbright environmental protection energy (zhenjiang) co., LTD |
2014 |
1 x 400 t/d waste incineratio boiler flue gas purification |
SDA rotating spray method | one set | EPC turn-key | ||
2 |
Everbright environmental protection energy (ningbo) co., LTD |
2015 |
1 x 500 t/d waste incineration boiler flue gas purification |
SDA rotating spray method | one set | EPC turn-key | ||
Dry acid and activated carbon injection system |
||||||||
1 |
Everbright environmental protection energy (changzhou) co., LTD |
2015 |
2 x 400 t/d waste incineration boiler flue gas purification |
Dry acid and activated carbon injection system |
two kits | EPC turnkey | ||
2 |
Everbright environmental protection energy (yiyang) co., LTD |
2015 |
2 x 400 t/d waste incineration boiler flue gas purification |
Dry acid and activated carbon injection system |
two kits | EPC turnkey | ||
3 |
Everbright environmental protection energy (monitoring) co., LTD |
2015 |
1 x 350 t/d waste incineration boiler flue gas purification |
Dry acid and activated carbon injection system |
one set | EPC turnkey | ||
4 |
Everbright environmental protection energy (suining) co., LTD |
2016 |
2 x 400 t/d waste incineration boiler flue gas purification |
Dry acid and activated carbon injection system |
two kits | EPC turnkey | ||
5 |
Everbright environmental protection energy (tengzhou) co., LTD |
2016 |
2 x 350 t/d waste incineration boiler flue gas purification |
Dry acid and activated carbon injection system |
two kits | EPC turnkey | ||
6 |
Everbright environmental protection energy (gaochun) co., LTD |
2016 |
1 x 500 t/d waste incineration boiler flue gas purification |
Dry acid and activated carbon injection system |
one set | EPC turnkey | ||
7 |
Everbright environmental protection energy (xiao county) co., LTD |
2016 |
1 x 400 t/d waste incineration boiler flue gas purification |
Dry acid and activated carbon injection system |
one set | EPC turnkey | ||
Waste incineration boiler hopper chute design, processing | ||||||||
1 |
Everbright environmental protection energy (ningbo) co., LTD |
2015 |
1 x 500 t/d living garbage incineration |
Slag hopper chute fall well under the hopper |
one set | |||
2 |
Everbright environmental protection energy (yiyang) co., LTD |
2015 |
2 x 400 t/d living garbage incineration |
Slag hopper chute fall well under the hopper |
two kits | |||
3 |
Everbright environmental protection energy (north) co., LTD |
2015 |
2 x 400 t/d living garbage incineration |
Slag hopper chute fall well under the hopper |
two kits | |||
4 |
Everbright environmental protection energy (DangShan) co., LTD |
2015 |
1 x 350 t/d living garbage incineration |
Slag hopper chute fall well under the hopper |
one set | |||
5 |
Qinzhou sea Noel green power generation co., LTD |
2015 |
2 x 300 t/d living garbage incineration |
Slag hopper chute fall well under the hopper |
two kits |